Yuleng Group Jia County salt chemical Co., Ltd. environmental protection testing special industrial elevator project
Yuneng Group Jia County Salt Chemical Co., LTD. Boiler chimney outer cylinder elevation 38 meters flue gas online continuous monitoring system chimney CEMS industrial elevator equipment, It puts forward the technical requirements including chimney CEMS industrial elevator body, support structure, envelope structure and chimney and platform connection and power supply connection, accessory device function design, structure, performance, installation and test.

The chimney height is 100 meters, the lifting height must meet the online continuous monitoring of smoke at 38 meters, the load is 450kg, the rated load is 3 people, the running speed is 0 ~ 0.5m/s (frequency conversion speed regulation), the box size (width 1000mm× length 1200 mm× height 2200mm).






Ms.Lily International Sales Director
Join 3S Group









