
First in the world! 3S lifting equipment equipped with far-reaching sea floating wind fishing integration project
With the acceleration of the layout of offshore wind power projects and the exploration of the development of Marine resources, China has created a new development model of "green energy + blue granary". On October 31, the world's first floating wind and fish integration project completed all engineering installation at the Nanri Island offshore wind farm in Putian, Fujian Province, and will be put into production to generate electricity.

3S tower climber increases efficiency for paper mill staff to climb the plant area
In a large paper mill, due to its vast area and multi-storey buildings, staff need to frequently climb between floors and high platforms in daily inspection and equipment maintenance, etc. The traditional way is not only time-consuming and labor-intensive, but also has certain security risks. In order to improve work efficiency and personnel safety, the paper mill decided to introduce 3S tower climber as a solution.

China's Xining Sanjiang hydropower generation and maintenance project uses 3S tower climber machine lifting equipment to solve the problem of personnel climbing
Various equipment in hydropower stations, such as generators and turbines, require regular overhaul and maintenance. Lifting equipment can help workers easily reach different heights and positions to inspect, repair, and replace components of the equipment, ensuring their normal operation and improving power generation efficiency and stability.

China Rizhao Huaneng power plant industrial elevator project
As the country's requirements for environmental protection become more and more stringent, manufacturers pay more and more attention to the maintenance of environmental protection equipment. At present, the second phase of the 65-meter platform can only be stepped up, which seriously affects the defect treatment and maintenance speed of environmental protection equipment, and is environmentally friendly to Huaneng Rizhao Power Plant.

3S tower climber application in port large crane climbing solutions
Due to the long-term operation of a large crane in a busy port, it needs to undergo regular high-altitude maintenance. Traditional manual climbing is not only time-consuming and labor-intensive, but also poses great safety risks. In order to improve the maintenance efficiency and safety, the port decided to introduce 3S tower climber.





Ms.Lily International Sales Director
Join 3S Group









