3S LIFT CP4-500 Suspension Platform
Video
product description

SafeLock
Avoid the platform over speed descent.

Electrical Control System
Control the operation of the platform, and its alarm sounds in case of an emergency.

Traction Hoist and Overload Detection Device
Drive the platform to descend and ascend the towers, preventing overload operation.

Hanger

Wall Roller Assembly
Telescopic arm can be adjusted to maintain the distance between the platform and the inner wall of the boiler.
Key Features
3S CP4-500 Mixed Tower Suspension Platform is a cement tower lifting construction lifting unit, which can be applied to different diameters of the tower.
Replace the suspension point fall arrester alternately by section: After reaching the limit of the tower turbine in this section, hang the anti-fall hook on the platform and replace the upper suspension point on the upper section.
(Customizable) Camera or helmet: Real-time monitoring of safety hazards on the platform to protect personnel safety.
Traction hoist and overload detection device: Drive the platform to descend and ascend the towers, preventing overload operation.
Upper limit switch: Protects the platform from exceeding the safety distance.
SafeLock: Avoid the platform over speed descent.
Electrical control system: Control the operation of the platform, and its alarm sounds in case of an emergency.
Wall roller assembly:Telescopic arm can be adjusted to maintain the distance between the platform and the inner wall of the boiler.
Specifications
Model |
CP4-500 |
weight |
1300 Kg |
Rated load |
600 Kg |
Rated voltage |
400 V / 690 V |
Speed |
9 m/min |
Dimensions |
Can be customized |
Power supply |
7.2 KW |





Ms.Lily International Sales Director
Join 3S Group











